Installation method of rigid support
Installation conditions:
1. Avoid
taking root in infill walls and concrete beam bottoms.
2. This type of support should be installed on the bearing members
with concrete strength grade ≥C30.
3. If the support is
installed in wet environment and outdoors, it is recommended to
use hot-dip zinc products.
4. In order to ensure that
the anchoring force of the expansion anchor bolt meets the
requirements, the anchor bolt must be driven into the specified
depth.
Notes:
1. It is recommended to leave a
safety margin of 50CM at the lower end of the support.
2. The
support shall be installed vertically, without side bending or
skew.
3. Cut the channel steel with the back scale line as the cutting point, do not cut the back hole.
4. In order to
ensure the good stress of the support, the pre-tightening torque
of grade 8.8 bolts is as follows: Hexagon bolt M10 bolt =40~50Nm,
M12 bolt =50~70Nm.
5. On-site installation personnel
must not drag the pipeline directly on the support.
6.
All support selection and support spacing are subject to the data
provided by professional design units.
Installation method of flexible support
Installation conditions:
1. Avoid
taking root in infill walls and concrete beam bottoms.
2. This type of support should be installed on the bearing members
with concrete strength grade ≥C30.
3. If the support is
installed in wet environment and outdoors, it is recommended to
use hot-dip zinc products.
4. In order to ensure that
the anchoring force of the expansion anchor bolt meets the
requirements, the anchor bolt must be driven into the specified
depth.
Notes:
1. It is recommended to leave a
safety margin of 50CM at the lower end of the support.
2. The support shall be installed vertically, without side bending
or skew.
3. Cut the channel steel with the back scale
line as the cutting point, and do not cut the back hole.
4. The screw rod joint and the position where the screw rod passes
through the cross arm shall be tightened up and down.
5.
On-site installation personnel must not drag the pipeline directly
on the support.
6. All support selection and support
spacing are subject to the data provided by professional design
units.
■ Description of design and construction of
finished support system
■ Single water pipe
rigid+flexible support (non-thermal insulation+thermal
insulation)
■ Rigid+flexible support of single cable
tray
■ Single duct rigid+flexible support
(rectangular+circular)
■ Rigid+flexible integrated
support of bridge+water pipe
■ Rigid+flexible integrated
support of air duct and water pipe
■ Rigid+flexible
integrated support of bridge+air duct
■ Rigid+flexible
integrated support of
water-electricy-wind